Fowlerex offers full commissioning and training procedures for every installation.
Commissioning may be provided in the form of Commissioning Supervision
(the Client providing the workforce), or Fowlerex provision of all staff
required.
The Commissioning Supervisor works closely with the Client’s engineering and trade staff at all times.
Mechanical and electrical commissioning is broken into two categories:
-
Cold
Commissioning is initiated when all components and circuits are
checked to the prior application of any power or process gas.
Following equipment inspection, the commissioning is increased to
application of power. Integration between mechanical and electrical
commissioning schedules are arranged to fit in with our Client's
programme of works. During all phases of the commissioning
procedure, the Client's personnel are involved as to gain hands-on
experience as part of initial training.
-
Hot
Commissioning begins when the process loads are gradually applied to
the equipment and service commences.
Safety of personnel involved in commissioning is of paramount importance.
Training of Client’s personnel is conducted at various stages throughout the plant commissioning and start-up. Training consists of various forms,
embracing practical on-site explanation, together with classroom-type
presentations using such means as drawings, descriptions, Microsoft
PowerPoint, etc.
Fowlerex offers training in equipment operation and maintenance at any
time during the life of the plant.
|